Browse Papers
From IFORS
Contact Us
English
Remember me
Login
Forgot password?
Jaejin Jang
Information about the author Jaejin Jang will soon be added to the site.
Found
10 papers
in total
Date Descending
Date Ascending
Title Descending
Title Ascending
Scheduling jobs on identical parallel machines with unequal future ready time and sequence dependent setup: An experimental study
2012
This paper studies the performances of Apparent Tardiness Cost based...
Estimation of the mean waiting time of a customer subject to balking: a simulation study
2006
To a customer, the waiting time for order processing for a product or service is...
Estimation of part waiting time and fleet sizing in AGV (automatic guided vehicle) systems
2004
As manufacturing systems have grown in size and complexity, material flow control has...
Vehicle travel time models for automated guided vehicle systems under various dispatching rules
2002
The design and evaluation of AGV-based material handling systems are highly complex...
An automated guided vehicle routing policy reflecting the current and future state of semiconductor and LCD production lines
2001
This paper presents an efficient policy for AGV and part routing in semiconductor and...
A look-ahead routing procedure for machine selection in a highly informative manufacturing system
2001
Many dispatching rules have been developed for the on-line control of product flow in...
A new procedure to estimate waiting time in GI/G/2 system by server observation
2001
Most GI/G/2 queueing formulae need the variance of inter-arrival time, which is in...
Realtime multiple vehicle routing problem using self-organization map
2000
This work proposes a neural network approach to solve vehicle routing problems which...
A look-ahead routing procedure in an FMS
1997
Many dispatching rules have been developed for the on-line control of product flow in...
Waiting time estimation in a manufacturing system using the number of machine idle periods
1994
To manage a manufacturing system, it is important to know the product flow time. Often...
Papers per page:
6 Papers
12 Papers
24 Papers
36 Papers
48 Papers