Browse Papers
From IFORS
Contact Us
English
Remember me
Login
Forgot password?
Marc E. Posner
Information about the author Marc E. Posner will soon be added to the site.
Found
13 papers
in total
Date Descending
Date Ascending
Title Descending
Title Ascending
Performance prediction and preselection for optimization and heuristic solution procedures
2007
The operations research literature contains numerous studies on the design and...
Scheduling parallel machines for the customer order problem
2005
This paper considers scheduling problems where jobs are dispatched in batches. The...
Sensitivity analysis for scheduling problems
2004
This paper represents a first attempt at a systematic study of sensitivity analysis...
The complexity of cyclic shop scheduling problems
2002
We consider scheduling problems for shops in which a job set is manufactured...
Generating experimental data for computational testing with machine scheduling applications
2001
The operations research literature provides little guidance about how data should be...
High multiplicity in earliness–tardiness scheduling
2000
When a production shop has a large number of identical parts, the parts are often...
Scheduling with finite capacity output buffers
1998
In many scheduling problems, a job that completes processing may need to be held in an...
Scheduling with finite capacity input buffers
1998
In many scheduling problems, a newly released job must be stored in an input buffer...
Preemptive scheduling with finite capacity input buffers
1997
In many scheduling problems, an arriving job is stored in an input buffer until it...
Approximation procedures for the one-warehouse multi-retailer system
1994
Two heuristic procedures for a one-warehouse multi-retailer system are developed....
Earliness-tardiness scheduling problems, I: Weighted deviation of completion times about a common due date
1991
This paper and its companion (Part II) concern the scheduling of jobs with cost...
Reducibility among single machine weighted completion time scheduling problems
1990
Various sum of weighted completion time problems are compared. The constraints...
The single machine problem with a quadratic cost function of completion times
1988
This paper examines a single machine sequencing problem with a quadratic cost function...
Papers per page:
6 Papers
12 Papers
24 Papers
36 Papers
48 Papers