Browse Papers
From IFORS
Contact Us
English
Remember me
Login
Forgot password?
Aharon Gonik
Information about the author Aharon Gonik will soon be added to the site.
Found
7 papers
in total
Date Descending
Date Ascending
Title Descending
Title Ascending
Optimal job-shop scheduling with random operations and cost objectives
2002
We consider a job-shop manufacturing cell of n jobs (orders), J i , 1⩽ i ⩽ n ,...
High performance heuristic algorithm for controlling stochastic network projects
1998
An activity-on-arc network project of PERT type with random activity durations is...
A heuristic for network project scheduling with random activity durations depending on the resource allocation
1998
This paper presents a heuristic for resource-constrained network project scheduling. A...
Stochastic network project scheduling with non-consumable limited resources
1997
This paper presents a newly developed resource constrained scheduling model for a PERT...
Using ‘look ahead’ techniques in job-shop scheduling with random operations
1997
We consider a job-shop scheduling problem with n jobs (orders) and m machines. Each...
Hierarchical decision-making model for planning and controlling stochastic projects
1996
The authors will consider a three-level decision-making model for controlling...
On-line control model for cost-simulation network projects
1996
This paper presents a newly developed hierarchical control model for several PERT type...
Papers per page:
6 Papers
12 Papers
24 Papers
36 Papers
48 Papers