Browse Papers
From IFORS
Contact Us
English
Remember me
Login
Forgot password?
Erdal Erel
Information about the author Erdal Erel will soon be added to the site.
Found
12 papers
in total
Date Descending
Date Ascending
Title Descending
Title Ascending
Minimizing weighted mean absolute deviation of job completion times from their weighted mean
2011
We address a single‐machine scheduling problem where the objective is to...
Mixed-model assembly line sequencing using beam search
2007
In today's manufacturing environments, companies have to produce a large variety of...
Batch scheduling to minimize the weighted number of tardy jobs
2007
In this paper, we address a single-machine scheduling problem with due dates and batch...
Optimal timing of project control points
2000
The project control cycle consists of measuring the status of the project, comparing...
A methodology for solving single-model, stochastic assembly line balancing problem
1999
In this paper, a methodology is developed to solve the single-model, stochastic...
Shortest-route formulation of mixed-model assembly line balancing problem
1999
A short-route formulation of the mixed-model assembly line balancing problem is...
Multicriteria inventory classification using a genetic algorithm
1998
One of the application areas of genetic algorithms is parameter optimization. This...
A goal programming approach to mixed-model assembly line balancing problem
1997
In this paper, a binary goal programming model for the mixed-model assembly line...
Effect of discrete batch WIP transfer on the efficiency of production lines
1993
In this paper, the effect of discrete batch transfer of WIP between workstations on...
Sequencing jobs on a single machine with a common due date and stochastic processing times
1991
This paper presents a procedure for sequencing jobs on a single machine with jobs...
Development of cost model for the single-model stochastic assembly line balancing problem
1990
In this paper the authors develop a cost model for the single-model stochastic...
Scheduling independent jobs with stochastic processing times and a common due date on parallel and identical machines
1989
The authors propose a heuristic procedure that constructs a schedule for N jobs with...
Papers per page:
6 Papers
12 Papers
24 Papers
36 Papers
48 Papers