Found 9 papers in total
Unrelated parallel machine scheduling with setup consideration and a total weighted completion time objective
2001
This paper addresses the problem of scheduling a set of independent jobs on unrelated...
An improved dynamic programming algorithm for the single-machine mean absolute deviation problem with a restrictive common due date
1995
In 1991, Hall et al. showed that the problem of minimizing the mean earliness and...
Single machine scheduling with a common delivery window
1996
In this paper the authors consider the single machine scheduling problem of minimizing...
Single-machine earliness-tardiness scheduling about a common due date with tolerances
1996
In this paper the problem of minimizing the mean absolute deviation of job completion...
Minimizing single-machine completion time variance
1995
In this article the problem of minimizing the completion time variance in n- job,...
Simultaneous optimization of efficiency and performance balance measures in single-machine scheduling problems
1996
n independent jobs are to be scheduled nonpreemptively on a single machine so as to...
An improved dynamic programming algorithm for the single-machine mean absolute deviation problem with a restrictive common due date
1995
In 1991, Hall et al showed that the problem of minimizing the mean earliness and...
A quadratic integer programming method for minimizing the mean squared deviation of completion times
1994
The problem of minimizing the mean squared deviation (MSD) of job completion times...
Scheduling about a large common due date with tolerance to minimize mean absolute deviation of completion times
1994
In this article the problem of minimizing the mean absolute deviation (MAD) of job...