Browse Papers
From IFORS
Contact Us
English
Remember me
Login
Forgot password?
B.L. Foote
Information about the author B.L. Foote will soon be added to the site.
Found
5 papers
in total
Date Descending
Date Ascending
Title Descending
Title Ascending
An interior point multiobjective programming approach for production planning with uncertain information
1999
This paper describes a conceptually simple but practical business planning method to...
DoorFAST; A constructive procedure to optimally layout a facility including aisles and door locations based on an aisle flow distance metric
1997
A methodology for designing a layout for factories, office buildings or homes is...
Managing a two-bottleneck job shop with a two-machine flow shop algorithm
1994
This work studies the possibility of using three new sequencing rules in a simple...
The effect of batch sizing and customer pressure (order modification) on a hybrid assembly job shop
1989
A hybrid assembly job shop is studied to determine if dividing an order into batches...
An application of simulation and network analysis to capacity planning and material handling systems at Tinker Air Force Base
1989
The authors developed a large simulation model to aid reconstruction efforts after a...
Papers per page:
6 Papers
12 Papers
24 Papers
36 Papers
48 Papers