Dileepan Parthasarati

Parthasarati Dileepan

Information about the author Parthasarati Dileepan will soon be added to the site.
Found 14 papers in total
A note on minimizing maximum lateness in a two-machine no-wait flowshop
2004
Job scheduling for a two-machine flowshop where wait time between the first and the...
Minimizing total flowtime and maximum job lateness in the two-machine flowshop system: a computerized algorithm
2003
This paper is an improvement to an extension of a previously published paper which...
Static scheduling research to minimize weighted and unweighted tardiness: A state-of-the art survey
2003
This paper reviews research on the total tardiness (TT) and total weighted tardiness...
Single machine scheduling with two job classes: Minimizing maximum lateness
2000
In this paper a single machine scheduling problem with two job classes is considered....
A bicriterion scheduling problem involving total flowtime and total tardiness
1999
The jobshop scheduling problems occur in industry in a variety of practical situations...
Minimizing a weighted quadratic function of job lateness in the single machine system
1996
In many real world environments, early completion of a job is as undesirable as is...
Single machine jobshop scheduling problem with weighted quadratic function of job lateness: A branch-and-bound approach
1995
This paper considers minimizing the sum of the weighted squares of lateness values for...
Common due date scheduling problem with separate earliness and tardiness penalties
1993
This paper considers the problem of finding an optimal schedule and a common due date...
Job lateness in a two-machine flowshop with setup times separated
1991
This paper considers the two-machine flowshop problem of minimizing maximum lateness...
Expert systems for managing operations
1990
Expert systems, or computer programs that simulate the actions of human experts, have...
Bicriterion jobshop scheduling with total flowtime and sum of squared lateness
1991
In this paper sufficient conditions for optimality for the single machine job...
Minimizing a generalized quadratic penalty function of job completion times: An improved branch-and-bound approach
1990
This paper considers the problem of minimizing a generalized quadratic penalty...
Learning: The missing ingredient in production planning spreadsheet models
1988
In production (aggregate) planning, an area well suited for spreadsheet application,...
The two-machine flowshop scheduling problems with total tardiness
1989
This paper considers the criterion of minimizing total job tardiness in the...
Papers per page: