Browse Papers
From IFORS
Contact Us
English
Remember me
Login
Forgot password?
Michael J. Brusco
Information about the author Michael J. Brusco will soon be added to the site.
Found
15 papers
in total
Date Descending
Date Ascending
Title Descending
Title Ascending
Optimal models for meal-break and start-time flexibility in continuous tour scheduling
2000
This paper presents a compact integer-programming model for large-scale continuous...
Starting-time decisions in labor tour scheduling: An experimental analysis and case study
2001
Many service organizations limit the number of daily planning periods in which...
Eliminating redundant columns in continuous tour scheduling problems
1998
This paper presents a procedure for eliminating redundant columns in generalized...
A morphing procedure to supplement a simulated annealing heuristic for cost- and coverage-correlated set-covering problems
1999
We report on the use of a morphing procedure in a simulated annealing (SA) heuristic...
A sequential integer programming method for discontinuous labour tour scheduling
1996
General set-covering formulations (GSCFs) of labor tour scheduling problems have...
Personnel tour scheduling when starting-time restrictions are present
1998
This paper presents an effective solution strategy for an important category of...
Improving personnel scheduling at airline stations
1995
Many service organizations encounter personnel tour-scheduling problems which focus on...
A morph-based simulated annealing heuristic for a modified bin-packing problem
1997
This paper presents a local-search heuristic, based on the simulated annealing (SA)...
Cost analysis of alternative formulations for personnel scheduling in continuously operating organizations
1995
Personnel-scheduling problems for continuously operating organizations have proven to...
Working set generation methods for labor tour scheduling
1994
Working set methods in labor scheduling generally consist of a generation and...
Overlapping start-time bands in implicit tour scheduling
1996
Many organizations face personnel scheduling decisions under conditions of variable...
Note: A local-search heuristic for large set-covering problems
1995
In this note the authors describe a local-search heuristic (LSH) for large non-unicost...
A microcomputer-based heuristic for tour scheduling of a mixed workforce
1994
Labor tour scheduling research has recently addressed environments which allow both...
The effect of demand characteristics on labour scheduling methods
1995
Labour scheduling heuristic methods have been applied in service operating...
A simulated annealing approach to the cyclic staff-scheduling problem
1993
This article presents the application of a simulated annealing heuristic to an...
Papers per page:
6 Papers
12 Papers
24 Papers
36 Papers
48 Papers