Browse Papers
From IFORS
Contact Us
English
Remember me
Login
Forgot password?
Robert H. Storer
Information about the author Robert H. Storer will soon be added to the site.
Found
9 papers
in total
Date Descending
Date Ascending
Title Descending
Title Ascending
Due date and cost-based FMS loading, scheduling and tool management
2007
In this study, we consider flexible manufacturing system loading, scheduling and tool...
Heuristic algorithms for a turbine-blade-balancing problem
2004
In the turbine-blade manufacturing industry, turbine-blades are machined and then are...
Melt scheduling to trade off material waste and shipping performance
2001
The ingot formation or ‘melt’ process is the first step in many...
Heuristic and exact algorithms for scheduling aircraft landings
1999
The problem of scheduling aircraft landings on one or more runways is an interesting...
A graph-theoretic decomposition of the job shop scheduling problem to achieve scheduling robustness
1999
In this paper we study the weighted tardiness job-shop scheduling problem, taking into...
Problem and heuristic space search strategies for job shop scheduling
1995
In an earlier paper we discussed ‘problem’ and ‘heuristic’...
Problem space search algorithms for resource-constrained project scheduling
1997
The Resource-Constrained Project Scheduling (RCPS) problem is a well known and...
Problem space local search for number partitioning
1996
The authors show how simple and effective metaheuristics can be developed for the...
One machine rescheduling heuristics with efficiency and stability as criteria
1993
Heuristics for the problem of rescheduling a machine on occurrence of an unforeseen...
Papers per page:
6 Papers
12 Papers
24 Papers
36 Papers
48 Papers