Bulfin R.L.

R.L. Bulfin

Information about the author R.L. Bulfin will soon be added to the site.
Found 5 papers in total
Minimizing the weighted number of tardy jobs on parallel processors
2005
We present a branch-and-bound algorithm to minimize the weighted number of tardy jobs...
Comparison of drum–buffer–rope and constant work in progress in an unbalanced production line with three stations
2004
The recently developed alternatives to traditional production planning and control...
Minimizing the weighted number of tardy jobs on a single machine
2003
In this paper, we describe an exact algorithm to solve the single machine weighted...
Minimizing the weighted number of tardy jobs on a two-machine flow shop
2003
In this paper, we describe an exact algorithm to solve the weighted number of tardy...
Quick and dirty sequencing for mixed-model multi-level JIT systems
1992
The authors extend an intuitive level part usage measure to the multi-level case, and...
Papers per page: