Gupta Deepak

Deepak Gupta

Information about the author Deepak Gupta will soon be added to the site.
Found 5 papers in total
A fuzzy logic-based approach for multistage flowshop scheduling with arbitrary lags and transportation time
2017
The aim of this paper is to introduce the concept of arbitrary lags in n‐jobs,...
Bi-criteria multistage flow shop scheduling with sequence-dependent setup times
2017
Flow shop scheduling with sequence‐dependent setup time is the most complicated...
Analysis of linkage network of queues with a multi stage flowshop scheduling system
2014
In today's information age society, where activities are highly interdependent and...
A computer-based total productive maintenance model for electric motors
2014
The paper describes the development of a computer‐based total productive...
Energy consumption modelling and benchmarking in continuous galvanising lines
2010
The pot hardware in continuous galvanising lines is prone to failure and needs to be...
Papers per page: